As we prepare for the start of significant construction projects as part of our campus redevelopment, some services and facilities will be affected at the Niagara-on-the-Lake Campus, beginning this weekend and until late August. Note that normal operations will continue through the construction period.

Please note the following moves and changes:

Niagara-on-the-Lake Campus:

April 22:

The Wellness Centre, Centre for Students with Disabilities and Counseling will move from W102 to E108.

The Health Centre will move from W105 to W213 (1&2)

Classrooms N101, W202 and W203 will be permanently closed.

April 25:

The Continuing Education office in W102B will move to room L24 at the Welland Campus

April 29:

The registrar’s office and on-campus recruitment officer will move from W109 to N102. Note that the Registrar’s Office will close mid-afternoon on April 29 and re-open in N102 on Monday, May 2.

May 11

Open gymnasium will close to be repurposed into student activity space.

Cafeteria will close until the end of August. Food services will be available at the Tim Hortons on the second floor, The Armoury, Bench to Go and Benchmark Restaurant.

Updates will follow, including moves and closures at the Welland Campus scheduled for mid-May.

Questions or concerns regarding these moves can be directed to Ralph Scholz, director, Facilities Management Services at rscholz@niagaracollege.ca.

These moves will accommodate significant projects that are set to being this spring, aimed at accommodating growth and enhancing the student experience. Projects include:

  • The 10,330 square-foot academic training addition at Welland will be constructed to the north side of the existing athletic centre, and will include an academic fitness lab and flexible space that can ultimately be used as a second gymnasium.
  • A 37,000 square-foot cafeteria and Simcoe building expansion at Welland. This project, situated at the north end of the Simcoe Building, will include a new 525-seat cafeteria, student activity centre, kitchen and server, an expanded prayer room along with renovations to accommodate justice studies programs, including demonstration labs and classrooms.
  • The 20,000 square-foot fitness centre and classroom project at Niagara-on-the-Lake includes an expansion to the east side of the campus to replace the existing fitness centre while adding change rooms, an exercise studio, offices, reception and six new 40-seat classrooms.
  • The first phase of student services renovations, learning commons and cafeteria project at Niagara-on-the-Lake will include the relocation of the info centre, registrar’s office, counselling and health services on the main floor, and the construction of a new student commons, redesigned cafeteria, and meeting rooms on the lower level.
    The first phase of renovations at the Welland Campus will include the relocation of counselling and health services in the Applied Health Institute.