IMPORTANT: Temporary Parking Changes at NOTL Campus

Summer parking changes NOTL 

To accommodate a re-paving and lighting upgrade Parking Lot “A” at the Niagara-on-the-Lake Campus will be closed as of July 2 and scheduled to re-open August 15. This work is part of a two-phase project to re-pave and upgrade the parking lots and roadways at the NOTL Campus.

Ample parking will be available in the “B” lots on the east-side of the NOTL Campus during this period. A full map of Niagara-on-the-Lake Parking Lots is available online. Please note the roadway leading from Taylor Road to the entrance to Lot A will also be repaved as part of this project. While each divided laneway is being repaved the other will be two-way.

To ensure the safety of students staff and visitors the construction area on the west side of the campus will be strictly out-of-bounds for the duration of the project. Entrances on the west side of the main campus building will be closed during this time and the entrance at the north-east corner of the main building will serve as the main entranceway.

This closure will also necessitate the re-routing of transit buses. The pick-up/drop-off area for Welland and St. Catharines Transit will be located outside the east entrance to the main building and will be indicated with signage (see above map). This re-routing will not affect route times.

All NC learning enterprises including Benchmark restaurant the Wine Visitor + Education Centre Greenhouse Teaching Spa and Teaching Brewery will remain open during this time. Dedicated parking for Benchmark restaurant will be in Lot B-1 (see above map).

We thank our students staff and visitors for their patience and understanding during this project. Questions regarding the closure can be directed to Bart Lanni Facilities Management Services at or ext. 7760